Toilets in the end stall and third stall of the girl's bathroom have poor water flow for flushing and require repair.
20.0
6.
Repair, seal, and repaint walls that are broken and cracked or broken through with a hole present in classroom #118. Replace broken exterior window pane on the front office window by the entrance lobby. Priority repair and replacement of the broken window pane is needed to prevent water and moisture damage to the building interior floors, walls, and ceilings and to keep pests out of the building. The sharp pieces of broken glass in this window also create potential safety and injury hazards. Priority repairs for safety are required.
15.0
11.
Leaf litter, fallen tree limbs, and debris is covering the front parking lot. High weeds are present around the parking lot perimeter. The school parking lots require trimming and blowing by the facility grounds contractor.
Repair nonfunctional ceiling light fixture in classroom #115.
20.0
11.
Aerosol sprays of cleaning chemicals including Lysol were left out in areas accessible to students in classrooms. Example: Lysol spray left out in classroom #122. Cleaning chemicals including aerosol sprays should be stored in areas not accessible by students. Example: Store cleaning chemicals and aerosol sprays in closed or locked cabinets and closets.
Repair toilets that have low water flow for flushing in the third stall of the girls hall bathroom and in class bathroom #126A.
20.0
6.
Repair ceiling leak adjacent to skylight in the dining room. Replace water stained ceiling tile after the source of this leak is fixed. Repaint chipped wall covering in classroom 126. Repair chipped covering on column in the dining room.
15.0
General Comments
Annual school facility sanitation inspection completed.