Complete the gravel fill in of the drainage trench along the back building foundation and at the rear sidewalk entrance into the classroom. This should be completed to prevent possible trip hazards.
Repair hurricane storm damage to roof of building and classroom windows.
30.0
General Comments
School is currently under renovations and repairs due to storm damage from Hurricane Michael. Children are not attending the school until storm repairs have been completed. A follow up inspection will be conducted by Wake County Environmental Services to verify repairs to roof and windows. Children will return to school after repairs have been completed in February 2019. Call 919-868-9245 to provide notice of repairs.
Repaint bathroom wall areas that are peeling. Replace missing baseboard along bathroom walls. Seal holes in wall areas around plumbing pipes. Replace missing floor tile in bathroom. Remove excess grout in bathroom and repair.
15.0
8.
Shield all the lights in the classrooms and in the restroom.
20.0
11.
C. Remove the paint cans that are outside. All cleaners must be stored in a cabinent, closet or locked.
Repaint bathroom wall areas that are peeling. Replace missing baseboard along bathroom walls. Seal holes in wall areas around plumbing pipes. Replace missing floor tile in bathroom.
30.0
General Comments
Replace missing light sheilds over ceiling fixtures. Nail points are pointing out of rail on outside activity platform. Please repair so that nail points are not exposed or accessible to children.